First Pour

Weather conditions could not have been more perfect for our first concrete pour. No rain, overcast skies, not too hot. Today the foundation footings were poured, arguably one of the most important steps to get just right. This is when the levelness and squareness of the rest of the structure get determined. We used exactly two trucks of concrete with not a cubic foot to spare. In fact, the second cement truck emptied before we were finished and there was just enough in the pump truck lines to finish the job. I can’t say enough about our ICF (Insulated Concrete Foundation) sub-contractor, BlueGreen Building Concepts. The quality and accuracy of their work have been exceptional.