Boxed In

All that remains to be done before I can move into my new shop is the painting of the ceiling. This can happen in a few more days when the plaster has completely dried. In the meantime, I am taking care of a few construction details. Pictured above is an “L” shaped box I built to protect the geothermal water lines which run from that foundation wall to the mechanical room. The red light shown dangling in the upper left-hand corner is used to signal when my dust collector bin is full. It will get affixed to the wall or ceiling once the painting has been completed.