Very Wet

Plaster work on the River House should be completed this week and will be followed by wood flooring installation but not before the indoor humidity reaches an acceptable level. I installed a digital hygrometer on each floor to monitor humidity levels. At this time it is hovering around 85% and the current and forecasted weather is not going to help much. I am going to look at renting an industrial dehumidifier to help speed things along.