Mirror, Mirror

I had planned to start cabinet fabrication today but another snafu with the bamboo plywood forced me to refuse delivery. More on this later. Instead, I turned my attention to the installation of four medicine cabinets. Although not a difficult task, I proceeded with great care so as not to damage any of the four mirrors (front of the door, back of the door, back of the cabinet, and adjustable magnifying mirror) or four glass shelves on each of these Robern units. Everything went smoothly.

Back to the bamboo. I will be fabricated all of the cabinetry throughout the house from bamboo plywood. 36 sheets to be exact from a company called CALI floors . After weeks of delay, it finally showed up today but on the wrong type of truck. Had I accepted delivery, it would have meant carrying one sheet at a time down the 300-foot driveway. This is precisely why I specified and paid for delivery on a flatbed truck with a piggyback forklift so that the entire pallet could be offloaded in one fell swoop and placed neatly in the new garage. Unfortunately, with driveway excavation for our new water main scheduled to begin Monday, any delay beyond then would now be measured in weeks since the driveway will be impassable during this phase of the work. Furthermore, the driveway will be blocked by a 110 ton crane all day tomorrow due to tree work. This means that the plywood has to be delivered on Friday. After I was unable to speak directly to anyone who could help me, I reached out to the President of the company and pled my case. To his credit he immediately got the right person working the issue and she very quickly sorted things out with the shipping company. Knock-on-wood, the plywood will arrive on Friday.