Thru Holes

The last bit of work needed to complete our underground utility installation was getting the conduits into the house. This necessitated drilling 5 holes through the concrete foundation, two large ones for electricity, two medium ones for fiber optic and cable, and one small one for an emergency-off circuit required to take the battery storage system offline in the event firefighters ever have to kill the power when battling a blaze.