Work Trade

This morning, Maya helped me prepare parts for 30 drawer boxes; 2 sides, a front and back for each one. That is 120 piece parts each requiring a lock miter joint at both ends and a full-length slot for the drawer bottom. Even with 80 more drawers to go (320 more piece parts) it still feels like we made a major dent in the work. With her help, we completed the work in one-third the time it would have taken me to do it alone. In the afternoon, we turned our attention to repairs for Maya’s tiny house which sustained major damage when a massive tree limb struck the front porch.

We used two hydraulic bottle jacks to elevate the roof ridge beam while simultaneously using a winch to pull the sides of the house inward. In a matter of a few hours, we were able to bring all the walls back to their proper positions and secure them in place. A lot of cosmetic work remains to be done, but we both felt thrilled to have addressed the major structural issues. Jeanine assisted by hauling all of the debris over to the dumpster at the River House.