Step and Repeat

It is fitting that on this last day of a year full of construction, I would be working on the last project standing in the way of getting our occupancy permit for the new house. The railing system for our stairs will use three vertical balusters per stair tread. These hollow steel tubes will be epoxied to the lag screws which I installed today but not until after I cut the heads off. I have opted for epoxy over an earlier idea I had since it will be stronger and offer more latitude for adjusting perpendicularity. In total, I installed just shy of 150 screws. Each one had to be perfectly positioned and driven in plumb. To accomplish this I built several jigs to ensure repeatability and accuracy.

Answer to yesterday’s puzzle: The bird sitting on the top shelf to the right of center.